1. Raise the plaster frame and hanger bar assembly to the desired location
between the two ceiling joists. Adjust the width of both hanger bars to the
distance between the joists. Position the assembly so that the mounting
clips of the hanger bars cup underneath the bottom edges of the joists.
Hammer down the nails of the hanger bars into the joists to secure the
assembly into place. (Fig. 8 )
ALL RIGHTS RESERVED. COPYRIGHT COMMERCIAL ELECTRIC 2011
Fig. 5
Remodel
clip
Housing
Foot
2. When the “foot” of each remodel clip touches the ceiling, push the
remodel clip through the “I” shaped opening. (Fig. 5)
3. Continue pushing the clips through, until they snap into position. The
“foot” of each clip will hook the edge of the hole, preventing the housing
from sliding further into the hole. (Fig. 6)
Fig. 6
Remodel
clip
Foot
Housing
NEW CONSTRUCTION INSTALLATION
HANGER BAR PREPARATION
The hanger bars are designed for joists that are spaced 16(40,6 cm) to 26
(66,0 cm) (center to center) apart. If the joists are less than 16 (40,6 cm)
apart, the hanger bars must be shortened to accommodate the narrower
space. To shorten them:
1. Spread the bars as wide as possible. (Fig. 7)
2. For each hanger bar, bend the “male” bar, back and forth at the 1
st
crease
from the center until it splits. Bend the “female” bar, back and forth, at the
1st notch from the center until it splits. (Fig. 7)
Fig. 7
1
st
Crease
Bend Here
1
st
Notch
Bend Here
“Male” Bar
“Female” Bar
3. Slide the “male” and “female” bars together and determine if the hanger
bar has been shortened enough. If not, separate the “male” and “female”
bars and break off additional material at the next crease and notch.
Continue to break off material until proper length is achieved. Do not
break off any more material than necessary.
4. Once proper length is achieved, separate the “male” and “female” bars.
Slide the “female” bars into the guides of the plaster frame. Slide the
“male” bars into the “female” bars.
CEILING JOIST INSTALLATION
Bottom
edge of
joist
Fig. 8
Hanger bar
Mounting
Clip
Plaster
Frame
Nail
2. Slide the plaster frame along the hanger bars to the desired position.
Tighten the locking screw (not shown) of the plaster frame to lock it in
place.
3. Run armored cable (BX) or non-metallic (NM) cable (also known as
Romex) from your circuit breaker or fuse panel to the plaster frame hole,
providing 6 (15,3 cm) to 8 (20,3 cm) of slack extending below the hole.
Cable having up to 12 AWG wiring may be used. (Fig. 9) (WARNING -
Use cables having wires rated 90°C or more.)
4. Detach the remodel clips from the housing.
5. Proceed to the ELECTRICAL CONNECTIONS section.
6. Slide the housing through the hole opening, as shown. (Fig. 10 & Fig. 11)
Fig. 9
BX Cable
Plaster
Frame
Housing
Plaster
Frame
7. Install the ceiling material, such as drywall, over the housing. A template
is provided to assist in making the holes in the ceiling material.
8. Proceed to the LIGHT BULB AND TRIM INSTALLATION section.
4. Proceed to the LIGHT BULB AND TRIM INSTALLATION section.